Busy day today, day three of the big bath job for the Palmers. Many trips for everyone, up and down the stairs. Floor's all cut up for both plastic drains and copper lines. Plumbers were back mid-morning to finish sweating joints. Kevin (electrician) spent about five hours doing the electrical rough-in, which involved much drilling and even a trip (for me) up onto the roof. Since it was sunny and fifty-five today, I didn't mind much; but I sure have lost any ability to handle steep-pitched roofs, as I did when I was twenty-five. I'll stick with kitchens and baths, please. Framing is all but complete, stopped short where the floor still has to be removed/replaced. Thursday will be hectic with multiple inspections: plumbing, electrical, framing, and insulation. Here's my fingers crossed.