Thursday was Inspection Day
Had some important visitors today at the Palmer bath. Nearly all construction had to stop, awaiting approval of the plumbing (which required an open floor), and of the electical (which required open walls and ceiling). The plumbers stopped by early to test their work, all good. That inspection passed at about ten am. Same guy gave the go-ahead for framing and insulation. That was good, too. Unfortunately, the electrical inspection didn't happen until almost three this afternoon. That did give me time to putter around with some of the smaller, tricky tasks, in addition to the floor re-install. So it wasn't so bad. Got a lot done, and even started the drywall, wherever it didn't interfere with the electrical stuff. Worked out fine in the end. Full speed ahead, then, for Friday. It's going to be a busy Friday for me. That's ok, too: busy is good. Busy pays the bills!